Home MCQs Electronics Engineering Question #11743
Back to Questions
Electronics Engineering QUESTION #11743
Question 1
When performing a hipot (dielectric withstand) test on a completed PCB assembly, the test voltage is applied between:
  • All circuit nodes and chassis/earth ground simultaneously
  • Primary and secondary circuits (or mains to safety ground) while all other points are connected together✔️
  • Individual components and their reference pins
  • The PCB surface and the copper ground plane through the substrate
Correct Answer Explanation
Hipot testing applies elevated voltage (typically 1.5–3 kV AC or 2–4 kV DC for mains equipment) between primary mains circuits and secondary/chassis earth (or between isolated circuits) to verify that the insulation can withstand overvoltage without breakdown. All primary conductors are connected together, and all secondary/earth conductors are connected together, maximising stress across the insulation barrier.